BY BRIAN MADDISON
Standing waiting for a London train the other day I was looking at the columns that support the canopy over platform 1 and it occurred to me to tell the story of why they show so many blemishes on the surface of the cast iron. If you look carefully at the photo below, you will see that there are a lot of “corrosion sores” which are the small circular indentations and a vertical depression which runs for the full height of the column. This is a casting mark made when the iron was poured into the mould.
Cast Iron corrodes much less than steel but when it is constantly wet and in a corrosive atmosphere (such as a smoky station in steam days) corrosion will take place. I think it is fair to surmise that at one time there was something attached to the columns that kept them damp and that is why they have corroded. The casting mark was probably due to the way that the wooden mould was made.
Back in about 1993, I was the engineer responsible for all the structures on the South end of the East Coast Main Line on behalf of Inter-City. I had a staff of around 200 artisans spread across depots in London, Hitchin, Peterborough and Doncaster and these staff included maybe 40 or so painters. Their principal task was to keep the metal bridges on the line from corroding by carrying out regular re-painting. However, they were also used on station buildings and in offices. Life on the railway was good at this time, the re-organisation into Sectors had produced tight-knit and semi-autonomous units where all departments worked together and had regular joint meetings. At about this time Inter-City managers were looking to improve their stock of stations and Grantham was no exception. One of the tasks was to repair the canopy over platform 1 and to carry out a complete re-paint. I was pleased to accept the work which was allocated to the Peterborough depot.
I have a pet hate and that is to see good paint brushed on to an improperly prepared surface and I believed that the only way to achieve a good job on iron and steel structures was to completely blast clean down to bare metal. Until I took charge at Peterborough, any blast-cleaning that was done had to be contracted out but this was expensive and often our tight budget would not stretch to include it. When that happened; our own painting staff would have to prepare the surface by chipping off the rust with hammers and needle guns but the job was never as good as it should be. I saw no reason why we should not get our own painters trained to blast clean and so I asked for volunteers and several came forward. Training was carried out by a specialist company in Sheffield. The results of this policy can be seen if you travel by train to London today and look out for the metal bridges painted Red and Blue (Network South East colours). This painting was done about 40 years ago and, apart from some fading, it is still in fair condition.
When I had a look at the Grantham canopy steelwork and the Cast Iron columns, they had clearly had many coats of paint applied over the years. Not only had this allowed rusting to continue under the paint layers in some places but on the columns the thick paint had obscured architectural features such as the grey frieze that can be seen in the earlier photo, where indentations were almost non-existent because layers of old paint had filled in the valleys.
In conjunction with the local works supervisor, it was agreed that all the metalwork would be blast cleaned before being painted with multiple layers of preservative paint and finishing with a final decorative coat in colours specified for Inter-City stations.
The work duly went ahead and the wrought iron roof beams benefitted enormously but after all the paint and corrosion on the columns had been blasted away, we were left with bare cast iron, which was full of corrosion holes, casting marks and, more seriously, actual holes in the cast iron which had formed during the casting and which had been filled with a hard putty-like material. This may well have been similar to the filler used to obscure holes in the Tay Bridge which contributed to its collapse and was referred to as “Beaumont’s egg”. We refilled the holes as best we could but the other surface marks that can be still seen today had to remain. This was a bit disappointing but once the full re-paint had been done, the marks were less noticeable and the overall effect was pretty good.
The columns have been re-painted again since but I don’t think any more blast-cleaning has been done!
One further anecdote about our blast-cleaning operations concerns the fly-over just north of Alexandra Palace station which takes the Down Hertford line over the ECML. Repainting of the soffit of the bridge required possessions but most of the upper works were done under lookout protection, including the trackside faces of the flyover itself. For this we fed a telephone lead into the helmet worn by the blast-cleaner which connected him through headphones to a lookout placed further up the line. Thus, he was warned to stop work and stand aside when a train was approaching. Although somewhat unorthodox, his was an acceptable system at the time but would certainly not be allowed today.
Brian Maddison - October 2026

Thank you. Very interesting.